News
SOCIETY
Complaints about the Dushanbe-Chanak highway prompted a response from the IRS
Some drivers and passengers on the Dushanbe–Chanak highway complain that an alternative free road is needed to connect the north of the country with the south, as is done in other countries. Residents complain that due to the lack of an alternative road, in case of accidents or avalanches in winter, the highway gets blocked, […]
Some drivers and passengers on the Dushanbe–Chanak highway complain that an alternative free road is needed to connect the north of the country with the south, as is done in other countries.
Residents complain that due to the lack of an alternative road, in case of accidents or avalanches in winter, the highway gets blocked, and people get stuck on the road. This is one of the serious problems of this highway, which has remained unresolved for many years. Furthermore, this is the only road connecting the north of the country with the south, and it is a toll road.
The company Innovative Road Solutions LTD (IRS), which manages the Dushanbe–Chanak toll road, responded to citizens’ complaints by stating that the construction of an alternative road is not on the company’s agenda.
“In fact, there are no free roads. The maintenance and repair of roads require financial resources. The introduction of a toll system was necessary to save budget funds and direct them to other purposes, including debt repayment and economic development,” the company writes.
IRS explains that since the Dushanbe–Chanak route passes through hard-to-reach mountainous areas, building such a road would not only require enormous costs but also its further maintenance would be extremely expensive. For this reason, the construction of another road in this section is practically impossible.
The company emphasized that free roads deteriorate over time.
“Today, in the 16 years of IRS’s operation, the Dushanbe–Chanak route remains one of the relatively well-maintained roads in the country,” the statement says.
In 2019, the then Minister of Transport of Tajikistan Khudoer Khudoerzada sharply criticized the work of IRS for “acting arbitrarily in reporting to the authorities.” The minister stated that due to the irresponsible attitude of IRS branch employees on the Dushanbe–Chanak route, traffic jams occur, and many drivers are forced to wait in line at the toll booths for two to three hours.
Social media users expressed dissatisfaction with the company’s activities and response in the comments under IRS’s reaction.
“In Spain, one of the main roads in the country was handed over to a company under contract. When the contract expired, thousands of kilometers of road became free. The IRS also signed a contract for several years. The question is — when will this contract end? As for the alternative road, the old road should have been left, and IRS should have built a new one. Every car pays an annual road tax, which, by the way, is higher than in many countries,” writes one user.
“The minimum toll to Khujand will be 69 somoni. If we calculate: 69 somoni × 500 cars × 30 days × 12 months = 12,420,000 somoni per year. And this is with the current condition of the Varzob tunnel!”, calculates another user.
Users also noted the high cost of traveling on the road.
“The paid road is normal, but the cost of the Dushanbe–Khujand road is simply excessively high!!!”
However, some users, on the contrary, supported the existing system, noting that despite the high price, the quality of road service is better compared to free roads.
The Dushanbe-Chanak road is the only paid highway in Tajikistan that connects the capital with the northern part of the country. The road was reconstructed in 2009 with investments from a Chinese company amounting to 296 million dollars and was put into operation in 2010.
However, the government of Tajikistan still does not disclose who owns the road. It is also unknown where the proceeds from this paid road go. It is believed that the owner of the IRS company is the son-in-law of President Rahmon, Jamolidin Nuraliev, the first deputy chairman of the National Bank of Tajikistan. However, no government representatives are willing to comment on this.
The Dushanbe-Chanak highway is 354 kilometers long, with three tunnels (Maykhura, Istiklol, and Shahristan) and 24 protective walls built to prevent snow avalanches.
However, every year with the onset of cold weather, dozens of accidents and natural disasters are recorded on this section, resulting in the deaths of dozens of people annually. Drivers complain that despite the significant amounts collected from vehicles by the company owners, the road is not equipped considering the mountainous conditions, where there is always a risk of heavy snowfall and avalanches.